UPDATES TO NOTE: 1. New Roof installed 6/5/23; 2. Routine termite prevention (last exterior treatment was 6/26/24); 3. New gutters with 2 spouts (8/9/24); 4. All vents and ducts cleaned (6/27/24); 5. New smoke detector: Dining room (9/22/24); 6. HomeServe Insurance for Interior Plumbing and Drainage system 7. Deck refinished (8/25); 8. New carpeting down the stairs to lower level and in all lower level rooms (8/25); 9. Freshly painted interior (8/25); 10. Third floor hall bathtub/shower newly glazed/sealed (8/25); 11. Front exterior steps newly finished (9/25)